BOM Generation
What is a BOM?
A Bill of Materials (BOM) is a comprehensive list of all equipment, components, and labor required to provision a service. In telecom, BOMs are essential for:
- Engineering handoff - Detailed specs for implementation
- Procurement - Ordering equipment and materials
- Installation planning - Coordinating technicians and resources
- Inventory management - Tracking what’s needed where
- Cost validation - Ensuring quoted prices match actual costs
Quotrum automatically generates BOMs from your quotes, eliminating manual spreadsheet work.
Generating a BOM
From the Quote Wizard
After completing your quote configuration:
- Navigate to Step 6: Review
- Click Generate BOM (below pricing summary)
- BOM is created based on configured services
- Review or export immediately
From an Existing Quote
To generate a BOM for a saved quote:
- Open the quote from Quote Library
- Click Actions → Generate BOM
- BOM opens in a new view
Bulk BOM Generation (Professional/Enterprise)
Generate BOMs for multiple quotes at once:
- Go to Quote Library
- Select multiple quotes (checkbox selection)
- Click Bulk Actions → Generate BOMs
- Choose export format
- BOMs generated as separate files in a ZIP
BOM Components
A Quotrum-generated BOM includes:
Equipment List
All required hardware:
- Routers - Model, quantity, location
- Switches - Type, port count, power requirements
- Fiber optics - Media converters, SFPs, patch panels
- CPE - Customer premises equipment (modems, ONTs)
- Power - UPS, power supplies, backup batteries
- Mounting - Racks, rack units required, wall mounts
Each item includes:
- Part number / SKU
- Manufacturer
- Quantity per site
- Total quantity
- Unit cost (optional)
- Total cost (optional)
Cabling Requirements
Physical connectivity needs:
- Fiber type (single-mode, multi-mode)
- Cable runs (length, routing)
- Connectors (LC, SC, ST)
- Inside plant vs outside plant
- Conduit requirements
Installation Requirements
Labor and logistics:
- Estimated installation hours
- Technician skill level required
- Special equipment needed (bucket truck, splice trailer)
- Site access requirements
- Permits required
Service Configuration
Technical configuration details:
- IP addressing plan
- VLAN assignments
- Routing protocols
- QoS policies
- Security policies
Documentation
Supporting information:
- Site contact information
- Building access codes
- Preferred installation windows
- Special instructions
- Delivery addresses (if different from site)
Customizing BOMs
BOM Templates (Professional/Enterprise)
Create custom BOM templates:
- Go to Settings → BOM Templates
- Click New Template
- Choose fields to include/exclude
- Set field ordering
- Add custom fields
- Save template
Use templates to generate BOMs for specific audiences:
- Engineering BOM - Technical details, no costs
- Procurement BOM - Part numbers and costs
- Installation BOM - Labor and logistics only
- Customer BOM - High-level equipment summary
Custom Fields
Add organization-specific fields:
- Go to Settings → BOM Configuration
- Click Add Custom Field
- Choose field type (text, number, dropdown, date)
- Set field name and description
- Choose which BOMs include this field
Examples:
- Internal job number
- Project code
- Cost center
- Purchase order number
- Warranty information
Equipment Substitutions
Override auto-selected equipment:
- Generate BOM as usual
- Click equipment line item
- Choose Substitute Equipment
- Select alternate model
- BOM updates with new specs and pricing
Use cases:
- Customer requests specific vendor
- Preferred equipment in stock
- Cost optimization
- Equipment refresh to newer model
Export Formats
Quotrum supports multiple BOM formats:
Excel Spreadsheet
Multi-sheet workbook:
- Summary - Overview of all sites and totals
- Equipment - Detailed equipment list
- Cabling - Cable runs and requirements
- Labor - Installation tasks and hours
- By Site - Separate sheet per site (for multi-site quotes)
Format: .xlsx
Best for: Procurement, engineering, internal use
PDF Document
Professional formatted document:
- Cover page with project details
- Organized sections
- Site-by-site breakdown
- Summary totals
- Your branding
Format: .pdf
Best for: Customer delivery, documentation, approvals
CSV Export
Simple comma-separated values:
- Single file, all equipment listed
- Easy import to other systems
- No formatting, pure data
Format: .csv
Best for: ERP integration, custom tooling, data analysis
JSON (Enterprise)
Structured data for API integration:
- Complete BOM in JSON format
- Programmatic access
- Integration with other tools
Format: .json
Best for: API consumers, custom integrations, automation
BOM Validation
Before finalizing a BOM, Quotrum validates:
Completeness
- All required equipment included
- No missing components
- Dependencies resolved (e.g., router requires power supply)
Compatibility
- Equipment works together (correct interfaces, power, protocols)
- Cables match equipment ports
- Bandwidth requirements met
Availability
- Equipment is in catalog
- Part numbers are current
- Not obsolete or end-of-life
Cost Accuracy
- Equipment costs match catalog
- Labor hours reasonable
- Total cost aligns with quote pricing
Validation errors and warnings appear before export. Fix issues before generating final BOM.
Working with Installation Teams
BOM Delivery
Share BOMs with field teams:
Email (Professional/Enterprise)
- Generate BOM
- Click Share → Email
- Enter recipient emails
- Add message
- Send (PDF attachment)
Cloud Link (Professional/Enterprise)
- Generate BOM
- Click Share → Create Link
- Copy link
- Share link (view-only, no download required)
- Set expiration date (optional)
Download and Forward
- Generate and export BOM
- Download to your computer
- Forward via your email or file sharing
BOM Updates
When quote changes after BOM generation:
- Update the quote
- Regenerate BOM
- Quotrum highlights what changed:
- Added items (green)
- Removed items (red)
- Changed quantities (yellow)
- Export updated BOM
- Notify installation team of changes
Installation Notes
Add notes for technicians:
- Open BOM view
- Click Add Note next to any section or item
- Enter instructions (e.g., “Install router in telco closet, 3rd floor”)
- Notes appear in exported BOM
Advanced BOM Features
Multi-Site Optimization (Enterprise)
For quotes with many sites, optimize BOMs:
Consolidated Equipment List
- Combines all sites into single equipment list
- Shows total quantities needed across project
- Enables bulk ordering
Site-Specific BOMs
- Individual BOM per site
- Distributed to local technicians
- Includes only that site’s requirements
Regional Grouping
- Group sites by region
- Create regional BOMs
- Coordinate regional resources
Inventory Integration (Enterprise)
Connect to your inventory system:
- Configure inventory integration in Settings → Integrations
- BOMs show real-time availability:
- In stock (green)
- Low stock (yellow)
- Out of stock (red)
- Option to auto-order missing items
- Track BOM fulfillment status
Labor Estimation
Quotrum estimates installation labor based on:
- Service type complexity
- Number of equipment pieces
- Site conditions (building type, floor, access)
- Historical data (learns from past projects)
Labor estimates include:
- Hours per task
- Task description
- Required skill level
- Number of technicians
Customize labor rates in Settings → Labor Rates.
Cost Rollup
See cost summary:
- Equipment cost
- Cable and materials cost
- Labor cost
- Shipping and logistics
- Total BOM cost
Compare BOM cost to quote pricing:
- Margin analysis
- Cost vs price variance
- Identify high-cost items
Only visible to users with cost visibility permissions.
Troubleshooting
BOM generation fails
Common causes:
- Quote missing required configuration
- Equipment not in catalog
- Network timeout (large multi-site quotes)
Solution:
- Complete quote validation first
- Check catalog for missing items
- Try generating BOM per site for large quotes
Missing equipment in BOM
If expected items aren’t in BOM:
- Verify service configuration (item may be optional)
- Check if equipment was manually excluded
- Review BOM template (field may be hidden)
- Regenerate BOM to pick up catalog updates
Incorrect quantities
If quantities seem wrong:
- Check quote site count (1 site vs 10?)
- Verify if item is per-site or per-project
- Review equipment rules in catalog
- Contact support if persistent issue
Export formatting issues
If exported BOM looks wrong:
- Try different export format (Excel instead of PDF)
- Update Quotrum to latest version
- Check that custom templates are valid
- Clear cache and regenerate
Best Practices
- Generate BOMs early - Catch configuration issues before customer delivery
- Use templates - Standardize BOMs for consistency
- Review before export - Validate all fields are correct
- Version control - Keep copies of BOMs as quotes evolve
- Include notes - Add context for installation teams
- Update promptly - Regenerate BOMs when quotes change
- Archive completed BOMs - Reference for future similar projects
Next Steps
Learn more about working with BOMs:
- Export options - Detailed export format guide
- Catalog management - Customize equipment and rules
- Configuration - Set up labor rates and templates